1. P: Prepare, Implementation requirements are determined.
  2. P: Plan, Current infrastructure is examined.
  3. D: Design, A detailed implementation plan is created.
  4. I: Implement, A predefined test plan is executed.
  5. O: Operate, Routine maintenance is performance.
  6. O: Optimize, Audits and upgrades are performed.
arrow
arrow
    全站熱搜

    qmaw 發表在 痞客邦 留言(0) 人氣()