- P: Prepare, Implementation requirements are determined.
- P: Plan, Current infrastructure is examined.
- D: Design, A detailed implementation plan is created.
- I: Implement, A predefined test plan is executed.
- O: Operate, Routine maintenance is performance.
- O: Optimize, Audits and upgrades are performed.
全站熱搜
留言列表